by KE4AVB » Sun Oct 15, 2017 4:40 pm
Ahh one made under the John Deere owner ownership.
- First set the mixture screw at one turn (if two mixture set set at one turn). Personally I usually start at 1-1/2 turns.
- Start and run the unit for at least 5 minutes before attempting any adjustments.
- Start and set low speed mixture at best top speed.
- Once done then set idle speed at 3400 rpm for clutch models 3800 non-clutch models.
- Now make sure string is extend to the trimmer max line length before hi adjustment.
- Adjust optimum best speed.
These are the minimum max speeds.
- 15" with .080 line 7200
- 17" with .080 line 5800
- 17" with .095 line with gearhead 6000
- 17" with .105 line with Procut Head 5800
The truest measure of society is the how it treats its elderly, its pets, and its prisoners.